ICorr & NACE Level 3 Senior Inspectors

30 + years of experience

State of the art IRIS intelligent reporting

ICorr & NACE Level 3<br/> Senior Inspectors
ICorr & NACE Level 3
Senior Inspectors
Read More
<p style="line-height:45px;">30 + years of experience</p>

30 + years of experience

Read More
State of the art IRIS intelligent reporting
State of the art IRIS intelligent reporting
Read More

Watford Town Hall

Watford Town Hall and Colosseum
Busy day for PIL completing the 3rd visit to complete inspections and sample collection for lead and heavy metals analysis.

IMG_2910
Watford Town Hall

Blackpool Tower Inspections

Paint Inspection Ltd has been chosen to conduct independent inspections for the refurbishment of the iconic Blackpool Tower.
A fantastic project that gets underway on Monday!

Cardiff Station Survey

Our team recently spent a couple of busy nights conducting a coating condition survey on the canopies at Cardiff Central Station. As one of the few inspection companies directly approved by Network Rail, we possess all necessary certifications to perform these tasks.

Surface Profile Info

Importance of Surface Profile
Quite simply it improves adhesion and subsequently coating performance: The surface profile impacts how well coatings, paints, and adhesives adhere to the material. It’s important that the profile is suitable for the coating system used and in accordance with the specification.

Queen Elizabeth Bridge Inspections

If you're afraid of heights, this job definitely isn't for you.
Ian, one of the directors at PIL, was recently inspecting the coating condition inside the suspension cable boxes of the Queen Elizabeth Bridge.

Chelsea Bridge Survey

Keith and Scott spent a few days in the bustling city to conduct a survey on Chelsea Bridge, one of the iconic and beautiful structures along the River Thames, as per CM431 guidelines. Our client eagerly awaits the completed report and the necessary recommendations for the next phase of maintenance.

Wimbledon Centre Court

Earlier this year, Ian carried out a survey to assess the condition of the coating on the Wimbledon Centre Court roof.
The Centre Court roof at Wimbledon is an impressive example of engineering that boosts both the prestige and functionality of the tournament. Installed in 2009

A19 Tees Viaduct

Since 2014, Paint Inspection Ltd has been collaborating with a major client to conduct coating condition surveys and maintenance inspections on the A19 Tees Viaduct. This effort is part of a significant DBFO project on the A19, which is still ongoing.

Splashworld

At Paint Inspection Ltd, the spectrum of our tasks is incredibly vast, ranging from annual inspections of Splash World's roof structure to a comprehensive survey of Liverpool Street Station's roof and everything that falls within this scope.

Salt Testing

Understanding the presence of soluble salts on surfaces is vital for the longevity and performance of protective coatings. High levels of salt contamination can result in adhesion failure, blistering, and corrosion. Hence, soluble salt testing is a pivotal process in preventing these issues and ensuring the success of protective coatings.

A13 River Lea

Paint Inspection Ltd is excited to announce that they have secured the contract to conduct independent inspections for the projects on the A13 River Lea.
The River Lea Crossing in East London is a single-span steel arch bridge, originally constructed in the 1930s.

London Liverpool Street

Our dedicated survey team had another productive weekend at London Liverpool Station. They meticulously carry out a range of tasks from lab FTiR testing to compatibility trials, ensuring the highest quality.

Sealless Pump Inspections

inal NACE 3 inspections on the next batch of pumps heading out to the North Field Expansion Project. Paint Inspection Ltd have been providing these services for nearly a year with over 70 sealless pumps, blasted, painted and fully signed off ready for service.

M27 Gantry Inspections

The intricate workings of the UK's infrastructure often go unnoticed by many. A single gantry, for instance, requires the expertise of seven distinct trades, each carrying out their specialized tasks.

Kings Lynn Tail Sluice

eflecting on a remarkable week spent at Kings Lynn Tail Sluice, I am filled with gratitude. Our project was executed with efficiency, finishing ahead of schedule and under budget. This achievement wouldn't have been possible without the invaluable assistance from Can Access and Orion Access whose support made all the difference.

Manganese Inspections

Scott one of our level 3’s has completed the second set of inspections on specialized parts undergoing a Manganese Phosphating process.
The specification required blast-clean surfaces to Sa3 ISO8501-1,which necessitates soluble salt checks and a surface profile check.

Zekon Poland

Today, one of our directors at PIL conducted a thorough inspection at Zekon SP in Poland. Our dedicated inspection team is always ready to travel wherever necessary, ensuring our clients that their projects are executed according to the specified standards.

Scott IRATA Pass

CM431 Surveys

Our dedicated team had yet another productive evening conducting highway surveys in alignment with CM431. This is merely a glimpse into one of our expanding business sectors.

Dolgarrog RWE

Looks like Andy Peters is having a blast at the Dolgarrog Jetty! What a stunning day it is out there, picture-perfect indeed!

M20 Survey CM431

Another busy week for the Highways team at Paint Inspection Ltd. Ian and Scott are hard at work completing another CM431 survey on the M20, meticulously examining both the external and internal aspects of the box girders for a comprehensive assessment.

Toyota Roundabout

It’s busy times on the Toyota Roundabout for our level 3 inspector Tess. Covering all aspects of the testing on behalf of our client.

Holmen Clarifiers

As we conclude this project, it has been a remarkable experience to collaborate with our client who insisted on maintaining a full-time presence from the onset of fabrication to the completion of onsite repairs to these sizable clarifiers located in the North.

Haddiscoe Viaduct Survey

Paint Inspection Ltd recently conducted a major survey at Haddiscoe Viaduct. All highway surveys adhere to the CM431 document guidelines.

Newhaven Swing Bridge

“Oh I do love to be beside the seaside, oh I do love to beside the sea 🎼“
It’s a beautiful day to be conducting a survey on the Newhaven Swing Bridge. Both Andy and Rob are completing various elements using drones to visually inspect the inaccessible areas.

Colne Barrier Survey

It’s been a busy week on the South Gate of the Colne Barrier completing a coating condition on the interior and exterior of the gate. Ian Patterson definitely got the short straw working in the confined space on the internal cells, although his skin looked fabulous from all the mud

Tees Newport Bridge

Andy Peters, one of our Level 3 inspectors, had a busy day conducting a quick follow-up survey on the Tees Newport Bridge.

A19 Inspections

Simon is having some busy nights managing the A19 projects. Several bridges are being worked on as part of the DBFO handback scheme, with five along this stretch alone, not to mention other areas of the network we're handling.